Contract Engineers Install New Cooling System at Closures


published on 23/09/10
Plastics packaging firm Closures has called a local team of mechanical contract engineers to install Cooling System within the Plant. The Cooling System is to implement energy-saving initiatives that could save the firm more than £52,000 a year.
Closures expanded its site earlier this year to house up to 12 injection-moulding machines and enlisted contract engineers to install a cooling system for the site, backed by a Carbon Trust loan.
Mr Peter Acres, Director of Closures stated that the system includes an adiabatic cooling system for the hydraulic oil coolers as will as a multi-circuit chiller and air blast cooler for the moulds to provide partial and up to 100% free cooling during low ambient conditions.
The local outsource contract provider state that the contract engineers are able to easily service and maintain the new system.

Read the full article at Packaging News

News Archive

Contact

© 2012 Packserve Ltd
Pitville Street
Darwen
Lancashire
United Kingdom
BB3 1HJ

tel: +44 (0) 1254 760 123
fax: +44 (0) 1254 760 155
email: info@packserve.co.uk

VAT No: 759 3719 82
Co. Reg. No: 3970189


Web Design By Farmore

Enquire