Packaging Line Relocation & Installation
Planned, engineered line moves delivered with minimal disruption.
When packaging lines are relocated or newly installed, risk increases at every stage. Packserve delivers engineering-led relocation and installation projects that protect equipment, control risk, and restore stable production quickly and reliably.
Risk Controlled • Equipment Protected • Downtime Minimised • Stability Restored
Where Engineering Control Is Critical
Packaging line relocation and installation introduce risk long before production restarts. Without structured engineering control, misalignment, damage, or installation errors often surface later as repeat faults, instability, or lost output. Engineering-led oversight ensures long-term reliability is protected.
Controlled, Engineering-Led Delivery
Packserve manages relocation and installation as a controlled engineering activity, not a logistics exercise, planned and delivered with reliability in mind.
- Packaging line disassembly and preparation
- Safe handling and transport coordination
- Mechanical and electrical reinstallation
- Alignment, setup, and format reconfiguration
- Commissioning and controlled restart
- Structured handover to production and maintenance teams
Each stage is managed to reduce risk, protect equipment, and support predictable long-term operation.
Relocation, Installation, or Both
Relocation and installation projects vary in scope and complexity. Packserve supports:
- Line Relocation Moving existing equipment within a site or between facilities, ensuring correct reinstallation and a controlled return to stable operation.
- New Line Installation Installing new or upgraded packaging machinery and integrating it into existing processes, utilities, and layouts.
- Combined Projects Relocation and installation delivered together, often during factory moves, site consolidations, or major upgrades.
Planning Before Work Starts
Successful relocations begin well before work starts onsite. Packserve engineers plan each project to ensure:
- Equipment is correctly documented and labelled
- Mechanical, electrical, and control interfaces are understood
- Utilities, guarding, access, and layout constraints are considered
- Restart and commissioning risks are identified early
This preparation reduces delays, rework, and post-restart instability, protecting long-term reliability.
Controlled Return to Production
Reinstalling equipment is only part of the job. Packserve supports commissioning and controlled ramp-up to ensure relocated or newly installed lines return to stable, predictable performance, including:
- Verification of correct installation
- Setup and adjustment during early running
- Identification and resolution of issues before full production resumes
The objective is not just restart, it’s stability under real production conditions.
Supporting Long-Term Reliability
Relocation and installation often expose underlying reliability risks or improvement opportunities. Where appropriate, findings can feed directly into wider engineering activity, including:
- Reliability Risk & Stability Assessments
- Preventative Engineering and Line Stabilisation
- Specialist or Capacity Engineering Support
There is no obligation, just clarity on where risk sits and what to do next.
Start a Relocation Planning Conversation
If you’re planning a packaging line relocation, installation, or combined project, we can help assess scope, risk, and the right level of engineering control before work begins. Discuss your requirements with engineers who understand packaging line reliability, not just project delivery.
Join leading UK producers already partnering with Packserve.
30+ years supporting UK production lines